沙拉機如果操作不當或是保養(yǎng)不合理,不僅沙拉機的使用壽命達不到預期的時長,同時還嚴重影響沙拉的口感味道。那么,沙拉加工設(shè)備在使用操作時都有哪些注意事項呢?
If the salad machine is operated improperly or the maintenance is unreasonable, not only the service life of the salad machine can not reach the expected time, but also seriously affect the taste of the salad. So, what are the precautions for the use and operation of salad processing equipment?
使用沙拉加工設(shè)備時,需要空轉(zhuǎn)機器,檢查是否有異常噪音。如果空轉(zhuǎn)正常,可以使用。在使用沙拉加工設(shè)備時,必須空機運行,檢查是否有異常響聲。如果空閑運行正常,則可以使用。開機前檢查滾筒和沙拉機刀是否有雜物,清洗干凈后再開機。擦拭沙拉加工設(shè)備時應(yīng)切斷電源;
When using salad processing equipment, it is necessary to idle the machine and check whether there is abnormal noise. If idling is normal, it can be used. When using salad processing equipment, the machine must run empty to check whether there is abnormal noise. It can be used if it is idle. Before starting up, check whether there are sundries in the drum and salad knife, and start up after cleaning. Cut off the power supply when wiping the salad processing equipment;
沙拉加工設(shè)備運行時,隨時注意水箱內(nèi)水位的蒸發(fā),防止水量不足造成電暖器干燒損壞;生產(chǎn)前水溫達到90-100度時,可暫時關(guān)閉電加熱器保持水溫以減少用電,生產(chǎn)前準備完成后可開啟電熱管;每天使用后,必須打開水閘,將水箱內(nèi)的水放掉,以防結(jié)冰。上班前加冷水或熱水,不易加水過多立即覆蓋主軸上方2-3厘米;
When the salad processing equipment is running, pay attention to the evaporation of the water level in the water tank at any time to prevent the dry burning damage of the electric heater caused by insufficient water; When the water temperature reaches 90-100 degrees before production, the electric heater can be turned off temporarily to maintain the water temperature to reduce power consumption. After the preparation before production, the electric heating pipe can be turned on; After use every day, the sluice must be opened to drain the water in the water tank to prevent freezing. Add cold water or hot water before work. It is not easy to add too much water. Immediately cover 2-3cm above the spindle;
沙拉加工設(shè)備每班換班前,應(yīng)在三通、篩底、軸承套內(nèi)側(cè)和絲杠軸上涂抹少量食用油,然后依次安裝,機器應(yīng)打開。每班后,應(yīng)使用松線機。頭部各螺紋鎖緊,防止老化后鎖緊,無法拆卸;沙拉加工設(shè)備工作中發(fā)現(xiàn)異響時,應(yīng)及時停機檢查;
Before each shift of salad processing equipment, a small amount of edible oil shall be applied on the tee, screen bottom, inner side of bearing sleeve and lead screw shaft, and then installed in turn. The machine shall be turned on. After each shift, the thread loosening machine shall be used. Each thread of the head is locked to prevent it from being locked after aging and cannot be disassembled; In case of abnormal noise during the operation of salad processing equipment, it shall be shut down in time for inspection;
操作
沙拉加工設(shè)備時,應(yīng)注意,防止發(fā)生不事故;沙拉機的安裝和使用應(yīng)按照用電規(guī)定謹慎操作;軸承工作200-300小時后,需要拆開潤滑脂;使用后,關(guān)閉并切斷電源,清洗機身上的摻假色拉。
Pay attention to safety when operating salad processing equipment to prevent unsafe accidents; The salad machine shall be installed and used carefully in accordance with the provisions on safe power consumption; After the bearing works for 200-300 hours, the grease needs to be disassembled; After use, turn off and cut off the power supply and clean the adulterated salad on the body.
以上所講內(nèi)容大家有了解過嗎?如何盡量避免操作失誤,降低沙拉加工設(shè)備故障率,更好的延長設(shè)備使用壽命,更多內(nèi)容的了解就來網(wǎng)站
suoniao.com.cn關(guān)注吧!
Have you understood the above contents? How to avoid operation errors as much as possible, reduce the failure rate of salad processing equipment and better prolong the service life of the equipment? For more information, please visit suoniao.com.cn Com follow!